Drinking Water Purification Plant Farshot in Qena Governorate with capacity of 35.000m3/ day

The Drinking Water Purification Plant Project in Farshout, Qena Governorate, is a vital project aims at providing clean and safe drinking water to the local population. The project contributes to improve water services and enhance  the quality of life, while also addressing the increasing demands for water and ensuring compliance with environmental and health standards.

Project Details

  • Type: Drinking Water Purification Plant
  • Location: Farshout, Qena Governorate, Egypt
  • Capacity: 35,000 m³ per day

Project Objectives

  • Providing Clean Drinking Water : The project aims to supply safe and high-quality drinking water that meets health standards, improving public health and living standards for population.
  • Meeting increasing Demand: As the population in the area increases, Farshout water purification plant will effectively meet the growing demand for drinking water.
  • Protecting Water Resources: The project promotes environmental sustainability by using advanced water treatment technologies, reducing pollution, and protecting local water resources.

Project Phases

  • Construction and Setup: Building the plant and equipping it with the latest technologies and equipment to ensure high efficiency in water purification.
  • Quality Testing: Regular testing of the treated water to ensure that, it meets the highest quality standards and safety for consumption.
  • Operation and Maintenance: Continuous operation and regular maintenance of the plant to ensure reliable performance around the clock.

    Expected Benefits

  • Improved Quality of Life: Providing clean drinking water helps reduce diseases that associated to the polluted water , positively impacting the community’s health.
  • Supporting Local Development: Enhancing water infrastructure in Farshout plant supports local development and improves the quality of essential services in the region.
  • Job Creation: The project creates new job opportunities during the construction and operation phases, contributing to the local economy and increasing employment.
GACOR77 CAIR77 ADMIN77 DP96 RUPIAH138 RECEH88 RECEH88 MANTUL138 MANTUL138 PASUKAN88 PASUKAN88 BOBO77 BAYAR77 BAYAR77 GARUDA69 RUPIAH138 GCR77 TANGO77 GACOR77 GACOR77 MODUS99 LORD88 GOCAP123 GACOR96 ODIN77 PARGOY88 PARGOY88 MAXWIN138 MAXWIN138 MAXWIN138 POLASLOT138 EPICWIN138 DISKO69 NGASO77 WIBU69 BESTI69 DINO69 BOSSWIN168 BOSSWIN168 RECEH69 MEWAHBET MEWAH99 FOYA88 SAWER138 PUAS69 MIDAS77 MIDAS77 SIP69 SIP69 MODUS99 MODUS99 GCR77 MASTER38 MABAR69 LOTUS138 LOTUS138 COCOL88 BARON69 DINASTI168 ZONA69 NOBAR69 RONIN86 STARLING69